Update: Ship Channel Bridge Restricted to Single Lane of Vehicle Traffic December 16-18

Toronto (December 16, 2019) – In order to accommodate necessary grating replacement work required to the Ship Channel Bridge, the bridge will be restricted to a single lane of vehicle traffic Monday, December 16 through to Wednesday, December 18. Traffic/re-routing signage and lighting will be in place to guide vehicles. Periodic bridge lifts may also take place during this time. 
 
The bridge will remain open to pedestrians and cyclists with access maintained via alternate east and west sidewalks.
 
Shipping and Port-related enquiries can be directed to Helen Oel in the Harbour Master’s Office at

 

​-30-